Setup Time Reduction Movie Review 1995

Information and Film Reviews for Setup Time Reduction the Movie

Visitor rating
4.0 from 0 reviews

This program teaches manufacturers how to increase production time by decreasing CNC machine setup time. Specific techniques to minimize setup time are shown.

Distribution

Society of Manufacturing Engineers, 1 SME Dr., PO Box 930, Dearborn, MI 48121, Phone: (313)271-1500, Toll-free: 800-733-4763, Fax: (313)425-3400, Email: service@sme.org, URL: http://www.sme.org

Available on VHS
Running time 60 minutes.

Cast and Crew

Genres
Industry & Industrialists

Copyright © 2024 Net Industries - All Rights Reserved