Small Gas Engine Disassembly III Movie Review 19??

Information and Film Reviews for Small Gas Engine Disassembly III the Movie

Visitor rating
4.0 from 0 reviews

Final part of the three-part "Small Gas Engine Disassembly Video Series." Features procedures for removal of the armature, breaker points, sump, oil slinger, cam gear, tappets, piston, and crankshaft. Also contains methods for checking point-gap, breaker-point-plunger, and endplay.

Distribution

CEV Multimedia, 1020 SE Loop 289, Lubbock, TX 79404, Phone: (806)745-8820, Toll-free: 800-922-9965, Fax: (800)243-6398, Email: cev@cevmultimedia.com, URL: http://www.cevmultimedia.com

Available on VHS
Running time 44 minutes.

Cast and Crew

Genres
Industrial Arts, How-To, Occupational Training

Copyright © 2024 Net Industries - All Rights Reserved