Visitor rating
Provides instruction to help attain certification for welding pipe in the 5G position. Includes footage of welding .375 inch wall pipe with the E-6010 and E-7018 rods, as well as running the root pass, hot pass, filler pass, and cap weld. Also provides views from inside the pipe while the root pass is being run.
Cambridge Educational, c/o Films Media Group, PO Box 2053, Princeton, NJ 08843-2053, Toll-free: 800-257-5126, Fax: (609)671-0266, Email: custserve@filmsmediagroup.com, URL: http://www.cambridgeol.com
Available on VHS
Running time 24 minutes.
Copyright © 2024 Net Industries - All Rights Reserved